Batok Offshore and Oil Services Nigeria Limited though is a recently incorporated company, has in its team a crop of technical Manpower who have been directly involved, with the marine maintenance activities in upstream oil industries.Projects that have been handled include:
Project Engineer / Certified OGP CSR (Client WorkSite Representative) - 2013 – 2014
Shell Petroleum Development Company (Nigeria)
- Corporate Underwater Maintenance Supervisory Roles and responsibilities/Achievement.
- Project Engineer onboard DSV Melody (Oct 2013)
- Carried out export crude line back flush and executed export crude loading floating hose removal and replacement, realignment of Forcados Terminal SPM 2 subsea hose.
- Project Engineer onboard BOURBON RHESOS (June 2013)
- Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Sea Eagle FPSO.
- Project Engineer onboard BOURBON RHESOS (April / May 2013)
- Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Bonga FPSO.
- Project Engineer onboard MV Melody DSV (Jan2012)
- Replaced ruptured subsea hose-string and carried out statutory 5-yearly change-out of floating hose-strings on Bonny SPM 2.
- Project Engineer onboard ATLANTIS DWELLER DSV (Nov 2011)
- Carried out inspection survey on the ruptured subsea hose-string.to determine the source of the leak on Bonny SPM 2.
- Project Engineer onboard Lamnalco Tanker handler- KUDU (Dec 2011)
- Installed Export Tanker mooring grommet assembly on Bonny SPM 3.
- Project Engineer onboard BOURBON RHESOS (June 2011)
- Carried out export crude line flush and executed export crude loading floating hose removal and replacement at Sea Eagle FPSO
- Supervision of a crew of 5 personnel to execute the export hose sectional replacement and leaking 20” swivel ball valve on the Sea Eagle
Underwater Engineer: 2008 – 2013
Shell Petroleum Development Company (Nigeria)
- FPSO including Mooring Hawser installation as part of the re-entry programme. (May to Sep 2009)
- Routine responsibilities included but not limited to;
- Crude loading Tanker mooring operations.
- Ensures the technical integrity of all SPDCs offshore, marine production structures in the Western region.
- Liaises with the offshore structural and underwater services team members.
- Monitor all berthing/loading activities inshore/offshore by regular checking
- Maintenance of SPM 1& 2 and loading hoses.
- Ensure ISO 14001 and OHSAS requirements are complied with in marine maintenance activities
- Manage the contractors offshore DSV / Barges
3rd DP Engineer - May 2006 to May 2007
Transocean Nigeria Limited
-
3rd Engineer on board deep water Discovery drilling Ship
-
Main Engine Rated out Put is 55520 kiwi and full DP Ship.
3rd Engineer.: 2005 to 2006 May
Seacor Marine Nigeria Limited
- Onboard MV Seacor Glory
Mechanic Fitter/Maintenance - July 2004
Ashtead A Plant London Company Ltd
- Shore base work as Mechanic Fitter and Maintenance
3rd Engineer: Dec 98- Dec 2002
International Oilfield Services Nig ltd
- 3rd engineer onboard IOSL discovery.
- SBM Maintenance.
Onboard Barge Major- October 1996-1998
Alusteel interoil & Dickson GMP JV USA LTD
- Deck Foreman onboard barge Major offshore contraction.
- SBM installation at ELF field in Cameroon Africa. S.B.M crude oil flushing.
- Floating pipe insulation (loading) S.B.M. Pressure test for leakage, and put back to loading operation
- Also Mooring rope Installation to the SBM.
Deck Foreman Onboard Barge: Feb 97 to May 97
Chevron Nig Ltd
-
6” Pipe Line from clock star and well heard to Okaan Platform, and Pressure Test
Onboard Barge Major- October 1996-1998
Texaco Angola
- Esongo Platform Texaco Oilfield
- Platforms upgrade and commissioning
- Crude oil flushing
- Installation of Turbine pump
Onboard Barge Major: Feb 97 to May 97
Edanga 1 platform Ashland oil field Nig West Africa
- Platform refurbishment and pipeline commission
- Crude oil and gas flushing
- Changing of manifold gasket and valves
On-Board TM GHZI (Tanker)- July 1995 - February 1996
Texaco Angola
- Engine room oilier /Ass-Pump man, sharing duty with a second engineer at anchorage; assisting in carrying out repairs on machinery and also the operation of cargo pump and boiler.
- Loading and offloading of PMS, AGO ,CRUDE OIL.
