• Your NO.1 Marine Maintenance & Mooring System Design Engineering Company
  • Talk an Expert : +234(0) 815 296 6394

Tandem Floating Hose String Assembly and Installation (BONGA FPSO); (SNEPCo)Shell Nigeria

Project Details

Assembly of the new floating hose string, Preparation for towing new hose string offshore, Disconnection of the old floating hose string from the FPSO, Connection of the new floating hose string to the FPSO, Dis-assembly of the old floating hose string, OCIMF testing the old hoses, Placement of hoses into long term storage