• Your NO.1 Marine Maintenance & Mooring System Design Engineering Company
  • Talk an Expert : +234(0) 815 296 6394

Past Experiences

Past Experiences

Batok Offshore and Oil Services Nigeria Limited though is a recently incorporated company, has in its team a crop of technical Manpower who have been directly involved, with the marine maintenance activities in upstream oil industries.Projects that have been handled include:

Project Engineer / Certified OGP CSR (Client WorkSite Representative) - 2013 – 2014

Shell Petroleum Development Company (Nigeria)

  • Corporate Underwater Maintenance Supervisory Roles and responsibilities/Achievement.
  • Project Engineer onboard DSV Melody (Oct 2013)
  • Carried out export crude line back flush and executed export crude loading floating hose removal and replacement, realignment of Forcados Terminal SPM 2 subsea hose.
  • Project Engineer onboard BOURBON RHESOS (June 2013)

  • Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Sea Eagle FPSO.
  • Project Engineer onboard BOURBON RHESOS (April / May 2013)
  • Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Bonga FPSO.
  • Project Engineer onboard MV Melody DSV (Jan2012)
  • Replaced ruptured subsea hose-string and carried out statutory 5-yearly change-out of floating hose-strings on Bonny SPM 2.
  • Project Engineer onboard ATLANTIS DWELLER DSV (Nov 2011)
  • Carried out inspection survey on the ruptured subsea hose-string.to determine the source of the leak on Bonny SPM 2.
  • Project Engineer onboard Lamnalco Tanker handler- KUDU (Dec 2011)
  • Installed Export Tanker mooring grommet assembly on Bonny SPM 3.
  • Project Engineer onboard BOURBON RHESOS (June 2011)
  • Carried out export crude line flush and executed export crude loading floating hose removal and replacement at Sea Eagle FPSO
  • Supervision of a crew of 5 personnel to execute the export hose sectional replacement and leaking 20” swivel ball valve on the Sea Eagle

Underwater Engineer: 2008 – 2013

Shell Petroleum Development Company (Nigeria)

  • FPSO including Mooring Hawser installation as part of the re-entry programme. (May to Sep 2009)
  • Routine responsibilities included but not limited to;
  • Crude loading Tanker mooring operations.
  • Ensures the technical integrity of all SPDCs offshore, marine production structures in the Western region.
  • Liaises with the offshore structural and underwater services team members.
  • Monitor all berthing/loading activities inshore/offshore by regular checking

  • Maintenance of SPM 1& 2 and loading hoses.
  • Ensure ISO 14001 and OHSAS requirements are complied with in marine maintenance activities
  • Manage the contractors offshore DSV / Barges

3rd DP Engineer - May 2006 to May 2007

Transocean Nigeria Limited

  • 3rd Engineer on board deep water Discovery drilling Ship

  • Main Engine Rated out Put is 55520 kiwi and full DP Ship.

3rd Engineer.: 2005 to 2006 May

Seacor Marine Nigeria Limited

  • Onboard MV Seacor Glory

Mechanic Fitter/Maintenance - July 2004

Ashtead A Plant London Company Ltd

  • Shore base work as Mechanic Fitter and Maintenance

3rd Engineer: Dec 98- Dec 2002

International Oilfield Services Nig ltd

  • 3rd engineer onboard IOSL discovery.
  • SBM Maintenance.

Onboard Barge Major- October 1996-1998

Alusteel interoil & Dickson GMP JV USA LTD

  • Deck Foreman onboard barge Major offshore contraction.
  • SBM installation at ELF field in Cameroon Africa. S.B.M crude oil flushing.
  • Floating pipe insulation (loading) S.B.M. Pressure test for leakage, and put back to loading operation
  • Also Mooring rope Installation to the SBM.

Deck Foreman Onboard Barge: Feb 97 to May 97

Chevron Nig Ltd

  • 6” Pipe Line from clock star and well heard to Okaan Platform, and Pressure Test

Onboard Barge Major- October 1996-1998

Texaco Angola

  • Esongo Platform Texaco Oilfield
  • Platforms upgrade and commissioning
  • Crude oil flushing
  • Installation of Turbine pump

Onboard Barge Major: Feb 97 to May 97

Edanga 1 platform Ashland oil field Nig West Africa

  • Platform refurbishment and pipeline commission
  • Crude oil and gas flushing
  • Changing of manifold gasket and valves

On-Board TM GHZI (Tanker)- July 1995 - February 1996

Texaco Angola

  • Engine room oilier /Ass-Pump man, sharing duty with a second engineer at anchorage; assisting in carrying out repairs on machinery and also the operation of cargo pump and boiler.
  • Loading and offloading of PMS, AGO ,CRUDE OIL.